Industrial park Friedrichsort, Kiel

Kiel-Friedrichsort is not only close to nature but also an industrial centre. The former Maschinenbau Kiel (MaK) site has developed into a modern heavy-machinery location. International companies from the engine construction, rail engineering and foundry industries and other service providers and suppliers take advantage of the ideal infrastructure conditions at the site in Friedrichsort, such as access to the Kieler Förde and on-site sidings. With around 1,200 employees and an area of about 65 hectares, the industrial park is a major industrial centre and an important employer in the Kiel region.


The customised GETEC energy solution

The challenge

The complete supply structure of the industrial park was to be assigned to a single provider. Extensive retrofitting and upgrades were needed in this context.

The goal

The new operator was not only supposed to retrofit and upgrade, but also to finance the transferred supply systems.

Our solution

As part of customised energy service contracting solutions for the customers at the industrial park, GETEC has assumed the responsibility for all functional and cost risks associated with the supply of energy and utilities as well as system and facility management since 2011. This includes the provision and demand-based delivery of steam for production and heating purposes, electricity, compressed air, drinking water, extinguishing water, cooling water and natural gas for engine test beds.

Facts and Figures

Steam

Centrally:  2 hot water boilers (4,200 kW + 1,300 kW)
Locally: 1 hot water boiler (215 kW), 4 water heaters (230 kW), 20 dark radiators (680 kW), equivalent to a total of 1,125 kW

Compressed air and natural gas

Compressed air: 3 compressors with a total capacity of 2,800 m³/h
Natural gas supply: in 3 pressure stages with 5,700 kW of connected wattage

Electricity and water

Electricity: Medium voltage network with 9 transformer stations (connected wattage: 16,000 kW)
Water: The well operation is scheduled to be shut down shortly. We will then use the grid of the municipal works for the supply. Approx. 22,000 m³/a were delivered in the past three years.

Our services rendered for the Industrial park Friedrichsort

Industrial park operation

We take care of the entire logistics infrastructure - from energy and water supply to plant security and grid infrastructure.

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

Paper-mill Julius Schulte, Trebsen

The company Julius Schulte Trebsen GmbH & Co. KG is one of the leading German providers of corrugated board base stock and specialty paper.

To the customer's website


The customised GETEC energy solution

The challenge

A new economical concept was supposed to cover the high steam and electricity requirements. In addition, the location was supposed to supply heat and electricity to cover its own needs. 

The goal

Set-up of two complementary plant concepts capable of ensuring the highest possible security of supply. 

Our solution

GETEC is building a natural gas fired combined cycle gas turbine power plant (CCGT) as well as a pulverised lignite fired cogeneration power plant.

Facts and Figures

Plant

Combined cycle gas turbine power plant and CHP plant

Supply

Steam & electricity, capable of isolated operation

Our services rendered for the Paper-mill Julius Schulte Trebsen

Steam supply

Safe and reliable steam supply

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

SCHOELLERSHAMMER GmbH & Co. KG 

The SCHOELLERSHAMMER paper-mill is producing corrugated base sheets using two paper making machines in the long-standing business location Düren. With a corporate history of 230 years, it is among the oldest paper-mills in Germany. Nearly 800 tons of paper is leaving the factory premises daily. With its 24/7 continuous operation, SCHOELLERSHAMMER is making an important contribution to life-cycle management, thereby conserving resources.

To the customer's website


The customised GETEC energy solution

High-efficiency CHP plant secures paper production.

The challenge

With a new paper making machine, the paper-mill has marked a milestone in its more than 230-year history of the family business, and substantially boosted its production capacity. Due to the planned increase in the paper production from 230,000 tons to more than 500,000 tons a year, the energy need has risen as well. 

The goal

Development of a high-efficiency combined heat and power plant that fulfils the requirements for a sustainable energy supply at the Düren location, while at the same time contributing to the success of the transition toward renewable energies. 

Our solution

The plant generates approx. 180 GWh/a of heat with a maximum steam capacity of 71 tons per hour. The electricity generated with combined heat and power covers the combined heating and power station’s own needs as well as partly the needs of the paper-mill. Thus, the energy supply to the long-standing location in Düren has now been secured well into the future. 

Facts and Figures

Plant

With pulverised lignite + natural gas + use of sewage gas from the sewage treatment plant of the paper-mill is an example of a multi-fuel fired plant

Supply

Heat, steam

Our services rendered for SCHOELLERSHAMMER

Energy-intensive industry

Significant reduction in emissions - benefit from cost advantages through innovative energies.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Steam supply

Safe and reliable steam supply

Learn more

Medical Centre Wahrendorff

The head office of the medical centres is located approx. 20 km east of the state capital Hanover in Sehnde, along with the two locations Ilten and Köthenwald. The medical centres provide outpatient, semi-inpatient and inpatient care in emergency psychiatry, psychosomatic medicine and psychotherapy. The entire medical centre has 310 hospital beds and 253 spaces for semi-inpatient care. Personalised and high-quality professional care is delivered to more than 1,060 residents in the different areas of the care home.


The customised GETEC energy solution

The challenge

Supply of the medical centre with heat for space heating, ventilation, hot water as well as electricity, if necessary, produced with state-of-the art, efficient energy generation systems.

The goal

Development of a sustainable heat and energy supply concept for all areas of the medical centre

Our solution

The various buildings are supplied by means of a total of 32 natural gas-based and/or HEL-based heat generation systems.
GETEC set up among other things two CHP units with an electrical output of 140 kW each in the Juliane Wahrendorff medical centre in Ilten as well as in the care home in Köthenwald.
The heat generated in the CHP units is used to supply the base load (heat); the generated electricity is fed into the medium voltage systems of the medical centres Ilten and Köthenwald. The refurbishment and expansion of the local heating network at the same time created combined heat supply systems, which make it possible to switch off heat generation units, thereby optimising the operational life of the CHP units. In the context of their refurbishment in 2015/2016, all heat generation systems were switched to energy-efficient condensing boiler technology.

Facts and Figures

Plant

32 heat generation systems with a total output of 7.4 MW as well as 2 CHP units.

Supply

Heat generation system: Heat for space heating, ventilation and hot water
CHP unit: Heat and electricity

Our services rendered for the Medical Centre Wahrendorff

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy partnership

We not only understand our business, we understand yours as well. Your success is our motivation.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

We embody partnership –
find your contact.

With more than 70 locations throughout Europe, we are always at your doorstep.
Contact us. We are here for you.

Contact
Sie suchen einen Ansprechpartner in Ihrer Nähe?
Einfach Postleitzahl eingeben
Karte wird geladen...