Our references


Berlin Exhibition Grounds 

Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.


The customised GETEC energy solution

The challenge

The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.

The goal

Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.

Our solution

Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.

Facts and Figures

CO2 savings

approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler

Plant

Boiler system, pellet boiler unit, CHP unit, cooling system 

Supply

Heat, cold, electricity

Our services rendered for Messe Berlin

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

Town of Turek (Poland)

The municipal works in Turek started operating in 1956 and are covering the entire range of communal services. The limited liability company is wholly owned by the municipality of Turek.


The customised GETEC energy solution

The challenge

Nearly 90,000 MWh of heat per year are needed for the properties in Turek with a population of 28,000 residents.

The goal

Above all, the new energy supply was supposed to be particularly economical, to realise low and stable energy costs for the community in the long term.

Our solution

GETEC presented a tailor-made concept and guarantees the town of Turek an economical, affordable and secure heat supply for a total of 30 years. The plan is to build a new plant on the property that was specifically purchased for this purpose. Starting in 2018, the heating station replaced the Adamów power station as heat supplier to the town of Turek.

Facts and Figures

Plant

2x pulverised lignite/gas fired hot water boilers (bivalent burner design)
1x gas fired hot water boiler

Supply

Hot water

Our services rendered for Turek

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy generation systems

Energy supply - efficient and decentralized.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Paper-mill Julius Schulte, Trebsen

The company Julius Schulte Trebsen GmbH & Co. KG is one of the leading German providers of corrugated board base stock and specialty paper.

To the customer's website


The customised GETEC energy solution

The challenge

A new economical concept was supposed to cover the high steam and electricity requirements. In addition, the location was supposed to supply heat and electricity to cover its own needs. 

The goal

Set-up of two complementary plant concepts capable of ensuring the highest possible security of supply. 

Our solution

GETEC is building a natural gas fired combined cycle gas turbine power plant (CCGT) as well as a pulverised lignite fired cogeneration power plant.

Facts and Figures

Plant

Combined cycle gas turbine power plant and CHP plant

Supply

Steam & electricity, capable of isolated operation

Our services rendered for the Paper-mill Julius Schulte Trebsen

Steam supply

Safe and reliable steam supply

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

G+D Gesellschaft für Energiemanagement mbH

The real estate group Deutsche Wohnen SE based in Berlin and the energy services provider GETEC have been in a strategic cooperation, the joint venture G+D Gesellschaft für Energiemanagement mbH, since 2013. The subject matter of the partnership is the energetic management of the properties of Deutsche Wohnen SE, which are scattered throughout Germany.


The customised GETEC energy solution

The challenge

GETEC and Deutsche Wohnen will plan and realise an appropriate, customised supply concept for every residential neighbourhood and/or supply structure. Apart from the technical requirements, the focus is also on efficiency measures to keep the rising energy costs in check. This will likewise benefit tenants of DW in the future. A total of approx. 111,000 residential units are currently supplied with heat.

Facts and Figures

CO2 savings

9,500 t per year

Supply

Heat and electricity

Number of supplied residential units

111,000 households

We consider this business model to be an attractive solution for the ecological and economical challenges as well as for the design of a sustainable energy concept for our real estate portfolio. This strategic partnership provides us with a high degree of co-determination on the one hand and with the flexibility to focus our resources on our core business on the other hand.

Michael Zahn

Chairperson of the executive board of Deutsche Wohnen SE

We embody partnership –
find your contact.

With more than 70 locations throughout Europe, we are always at your doorstep.
Contact us. We are here for you.

Contact
Sie suchen einen Ansprechpartner in Ihrer Nähe?