Radici Chimica Deutschland GmbH

Radici Chimica Deutschland GmbH, a chemical company belonging to the Italian Radici Group, produces over 100,000 tonnes of adipic acid per year in the Zeitz Chemical Park. The white powder is the raw material for the production of nylon and other plastics, which, for example, are used in the automotive and clothing industries.

To the customer's website


The customised GETEC energy solution

Modern and efficient energy supply concept for the chemical industry.

The challenge

Because the previous steam supply from the power station Mumsdorf was shut down in the summer of 2013, the management of the chemical company was looking for a viable, ultra-efficient and economical energy supply.

The goal

In the context of the supply concept, the idea was to also destroy the climate-damaging nitrous oxide (N2O) that accumulates on site, thereby lowering the greenhouse gas emission.

Our solution

GETEC opted to install two separate shell boilers. One is fired with particularly economical brown coal dust, whilst the other is fired with natural gas.

Facts and Figures

CO2 savings

approximately 100,000 tons of CO2 equivalents per year

Plant

Combined heat and power station with 2 steam boilers and back pressure steam turbine

Supply

Steam, electricity

Installed capacity

Thermal output: 37.1 MW;
Electrical output: 681 kW

We would never have dared to imagine that the problem with nitrous oxide can be resolved with pulverised lignite firing. […] This helps Radici achieve major savings in emissions trading, close to a million euros each year.


Jens Metzner

Plant manager of Radici Chimica Deutschland GmbH in the chemical and industrial park of Zeitz

Our services rendered for Radici Chimica

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Utilisation of specialty gases

Thermal utilisation of climate-changing special gases - pure environmental protection

Learn more

Steam supply

Safe and reliable steam supply

Learn more

EMMTEC services BV at the location emmtec Industry & Businesspark

Covering an area of 115 hectares, the emmtec Industry & Businesspark in Emmen is the largest industrial park in Northern Netherlands. A total of ten production plants from the biochemistry, fibre and polymer industries employ approximately 2,100 people at the site. 27 hectares of expandable surface area also offer a perfect supply of new settlements. Empowering your business. With EMMTEC Services – an enterprise of the GETEC Group.

To the customer's website


The customised GETEC energy solution

Tailor-made service and supply concepts: Required media, logistics, laboratory and engineering services

The challenge

As site operator for all local businesses, we operate a collective service concept in a complex network of material and energy flows.

The goal

As infrastructure operator, we strive to offer all services for industrial parks.

Our solution

With its customised services portfolio, EMMTEC services offers local companies ideal conditions. GETEC's redundant production supply units (assets) and infrastructure ensures that the production plants are supplied with the required utilities at all times.

Facts and Figures

Area

115 hectares, fully developed,
140,000 m² of building space,
90,000 m² of storage space,
2,000 m² of laboratory space,
8,400 m² of office space

Plant inventory

2 x 32 MWel combined cycle gas turbine power plant,
2 x 100 t/h of steam (up to 30 bar),
8 MW of refrigeration from absorption refrigeration and compression-type refrigeration machines,
180 m³/h of demineralised water, 
120 m³/h of drinking water,
400 m³/h of process water,
81,000 m³/h of compressed air,
Sewage treatment plant for 120,000 PE,
Air separation installation for nitrogen (1,350 Nm³/h),
10 x 300 m³ silo parks

Grids

150 km medium voltage network,
11 transfer stations,
154 oil-free transformers,
autonomous electricity system,
4.5 km natural gas network (up to 20 bar)

CO2 savings

The integral consideration as well as operation of the media supply achieves optimal energy efficiency. This enabled our customers to realise savings of 43% of CO2 per ton between 1990 and 2018.

Our services rendered for emmtec Industry & Businesspark

Industrial park operation

We take care of the entire logistics infrastructure - from energy and water supply to plant security and grid infrastructure.

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

SCHOELLERSHAMMER GmbH & Co. KG 

The SCHOELLERSHAMMER paper-mill is producing corrugated base sheets using two paper making machines in the long-standing business location Düren. With a corporate history of 230 years, it is among the oldest paper-mills in Germany. Nearly 800 tons of paper is leaving the factory premises daily. With its 24/7 continuous operation, SCHOELLERSHAMMER is making an important contribution to life-cycle management, thereby conserving resources.

To the customer's website


The customised GETEC energy solution

High-efficiency CHP plant secures paper production.

The challenge

With a new paper making machine, the paper-mill has marked a milestone in its more than 230-year history of the family business, and substantially boosted its production capacity. Due to the planned increase in the paper production from 230,000 tons to more than 500,000 tons a year, the energy need has risen as well. 

The goal

Development of a high-efficiency combined heat and power plant that fulfils the requirements for a sustainable energy supply at the Düren location, while at the same time contributing to the success of the transition toward renewable energies. 

Our solution

The plant generates approx. 180 GWh/a of heat with a maximum steam capacity of 71 tons per hour. The electricity generated with combined heat and power covers the combined heating and power station’s own needs as well as partly the needs of the paper-mill. Thus, the energy supply to the long-standing location in Düren has now been secured well into the future. 

Facts and Figures

Plant

With pulverised lignite + natural gas + use of sewage gas from the sewage treatment plant of the paper-mill is an example of a multi-fuel fired plant

Supply

Heat, steam

Our services rendered for SCHOELLERSHAMMER

Energy-intensive industry

Significant reduction in emissions - benefit from cost advantages through innovative energies.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Steam supply

Safe and reliable steam supply

Learn more

Medical Centre Wahrendorff

The head office of the medical centres is located approx. 20 km east of the state capital Hanover in Sehnde, along with the two locations Ilten and Köthenwald. The medical centres provide outpatient, semi-inpatient and inpatient care in emergency psychiatry, psychosomatic medicine and psychotherapy. The entire medical centre has 310 hospital beds and 253 spaces for semi-inpatient care. Personalised and high-quality professional care is delivered to more than 1,060 residents in the different areas of the care home.


The customised GETEC energy solution

The challenge

Supply of the medical centre with heat for space heating, ventilation, hot water as well as electricity, if necessary, produced with state-of-the art, efficient energy generation systems.

The goal

Development of a sustainable heat and energy supply concept for all areas of the medical centre

Our solution

The various buildings are supplied by means of a total of 32 natural gas-based and/or HEL-based heat generation systems.
GETEC set up among other things two CHP units with an electrical output of 140 kW each in the Juliane Wahrendorff medical centre in Ilten as well as in the care home in Köthenwald.
The heat generated in the CHP units is used to supply the base load (heat); the generated electricity is fed into the medium voltage systems of the medical centres Ilten and Köthenwald. The refurbishment and expansion of the local heating network at the same time created combined heat supply systems, which make it possible to switch off heat generation units, thereby optimising the operational life of the CHP units. In the context of their refurbishment in 2015/2016, all heat generation systems were switched to energy-efficient condensing boiler technology.

Facts and Figures

Plant

32 heat generation systems with a total output of 7.4 MW as well as 2 CHP units.

Supply

Heat generation system: Heat for space heating, ventilation and hot water
CHP unit: Heat and electricity

Our services rendered for the Medical Centre Wahrendorff

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy partnership

We not only understand our business, we understand yours as well. Your success is our motivation.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

We embody partnership –
find your contact.

With more than 70 locations throughout Europe, we are always at your doorstep.
Contact us. We are here for you.

Contact
Sie suchen einen Ansprechpartner in Ihrer Nähe?
Einfach Postleitzahl eingeben
Karte wird geladen...