SCHOELLERSHAMMER GmbH & Co. KG
The SCHOELLERSHAMMER paper-mill is producing corrugated base sheets using two paper making machines in the long-standing business location Düren. With a corporate history of 230 years, it is among the oldest paper-mills in Germany. Nearly 800 tons of paper is leaving the factory premises daily. With its 24/7 continuous operation, SCHOELLERSHAMMER is making an important contribution to life-cycle management, thereby conserving resources.
The customised GETEC energy solution
High-efficiency CHP plant secures paper production.
The challenge
With a new paper making machine, the paper-mill has marked a milestone in its more than 230-year history of the family business, and substantially boosted its production capacity. Due to the planned increase in the paper production from 230,000 tons to more than 500,000 tons a year, the energy need has risen as well.
The goal
Development of a high-efficiency combined heat and power plant that fulfils the requirements for a sustainable energy supply at the Düren location, while at the same time contributing to the success of the transition toward renewable energies.
Our solution
The plant generates approx. 180 GWh/a of heat with a maximum steam capacity of 71 tons per hour. The electricity generated with combined heat and power covers the combined heating and power station’s own needs as well as partly the needs of the paper-mill. Thus, the energy supply to the long-standing location in Düren has now been secured well into the future.
Facts and Figures
Plant
With pulverised lignite + natural gas + use of sewage gas from the sewage treatment plant of the paper-mill is an example of a multi-fuel fired plant
Supply
Heat, steam
Our services rendered for SCHOELLERSHAMMER
Energy-intensive industry
Significant reduction in emissions - benefit from cost advantages through innovative energies.
Fuel management
Sustainable and balanced fuel mix
Steam supply
Safe and reliable steam supply
Medical Centre Wahrendorff
The head office of the medical centres is located approx. 20 km east of the state capital Hanover in Sehnde, along with the two locations Ilten and Köthenwald. The medical centres provide outpatient, semi-inpatient and inpatient care in emergency psychiatry, psychosomatic medicine and psychotherapy. The entire medical centre has 310 hospital beds and 253 spaces for semi-inpatient care. Personalised and high-quality professional care is delivered to more than 1,060 residents in the different areas of the care home.
The customised GETEC energy solution
The challenge
Supply of the medical centre with heat for space heating, ventilation, hot water as well as electricity, if necessary, produced with state-of-the art, efficient energy generation systems.
The goal
Development of a sustainable heat and energy supply concept for all areas of the medical centre
Our solution
The various buildings are supplied by means of a total of 32 natural gas-based and/or HEL-based heat generation systems.
GETEC set up among other things two CHP units with an electrical output of 140 kW each in the Juliane Wahrendorff medical centre in Ilten as well as in the care home in Köthenwald.
The heat generated in the CHP units is used to supply the base load (heat); the generated electricity is fed into the medium voltage systems of the medical centres Ilten and Köthenwald. The refurbishment and expansion of the local heating network at the same time created combined heat supply systems, which make it possible to switch off heat generation units, thereby optimising the operational life of the CHP units. In the context of their refurbishment in 2015/2016, all heat generation systems were switched to energy-efficient condensing boiler technology.
Facts and Figures
Plant
32 heat generation systems with a total output of 7.4 MW as well as 2 CHP units.
Supply
Heat generation system: Heat for space heating, ventilation and hot water
CHP unit: Heat and electricity
Our services rendered for the Medical Centre Wahrendorff
Energy service contracting
Customised complete solutions - planning, construction, financing, operation
Energy partnership
We not only understand our business, we understand yours as well. Your success is our motivation.
Fuel management
Sustainable and balanced fuel mix
Berlin Exhibition Grounds
Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.
The customised GETEC energy solution
The challenge
The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.
The goal
Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.
Our solution
Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.
Facts and Figures
CO2 savings
approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler
Plant
Boiler system, pellet boiler unit, CHP unit, cooling system
Supply
Heat, cold, electricity
Our services rendered for Messe Berlin
Energy service contracting
Customised complete solutions - planning, construction, financing, operation
Fuel management
Sustainable and balanced fuel mix
Supply solutions
Simple and reliable supply - with GETEC
UNESCO world heritage site housing estate "Weiße Stadt" in Berlin-Reinickendorf
The successful transition toward renewable energies is a collaborative effort. GETEC in cooperation with real estate companies has been developing successful energy efficiency initiatives since 2013. The foundation was laid with Deutsche Wohnen SE and the milestone project “Weiße Stadt [White City]” of the joint energy services company G+D Energiemanagement mbH.
The customised GETEC energy solution
The goal is to generate additional profits with a sustainable and consistent realisation of all possible savings potentials.
The challenge
Supply of approx. 2,500 households with heat / combined heat and power station and district heating network with 31 substations
The goal
Reduction of the primary energy factor of the Weiße Stadt district heating territory from 1.3 to 0.89
Our solution
• Set-up of 2 x 5.8 MW hot water boilers
• Maximum energy efficiency by using economisers in the waste gas stream of the hot water boilers
• Set-up of an ultra-modern CHP unit (1 MWel)
• Feed-in into the public 10 kV grid
Facts and Figures
CO2 savings
Reduction of the emission by 3,800 t/a
Plant
Ultra-modern CHP unit (1 MWel) with a total thermal capacity of 12,550 KW
Supply
Heat
Our services rendered for Weiße Stadt
Energy service contracting
Customised complete solutions - planning, construction, financing, operation
Strategic partnerships
Energy efficiency cooperations between strong partners
Ancillary cost optimisation
Full service for industry and real estate
We embody partnership –
find your contact.
With more than 70 locations throughout Europe, we are always at your doorstep.
Contact us. We are here for you.