We have the energy for a closer partnership.

We not only understand our business, we understand yours as well

This special expertise for process-related questions makes us an ideal partner for the industry and the real estate sector. As outsourcing partner, we relieve you from all energy-related questions, allowing you to focus on your core competences. With GETEC by your side, you can pool your resources where they are needed. Entrust us with your energy-related questions, leaving you with energy for more – for more performance and more success.

We embody partnership.
The customer is the focal point of our reasoning and actions.

Energie Partnerschaft

The energy world of tomorrow is digital, networked and green. GETEC acts as a guide helping customers navigate an increasingly complex energy world. Because aside from the technological process expertise, GETEC also possesses the regulatory know-how. We use our knowledge of laws and formalities to derive optimal energy concepts for our customers and to generate savings that are far higher than the efficiency goals of our customers. What’s more, with cooperation partnerships aimed at boosting the energy efficiency in the industry and the real estate sector, we are creating genuine added values.

Our references


Industrial park Friedrichsort, Kiel

Kiel-Friedrichsort is not only close to nature but also an industrial centre. The former Maschinenbau Kiel (MaK) site has developed into a modern heavy-machinery location. International companies from the engine construction, rail engineering and foundry industries and other service providers and suppliers take advantage of the ideal infrastructure conditions at the site in Friedrichsort, such as access to the Kieler Förde and on-site sidings. With around 1,200 employees and an area of about 65 hectares, the industrial park is a major industrial centre and an important employer in the Kiel region.


The customised GETEC energy solution

The challenge

The complete supply structure of the industrial park was to be assigned to a single provider. Extensive retrofitting and upgrades were needed in this context.

The goal

The new operator was not only supposed to retrofit and upgrade, but also to finance the transferred supply systems.

Our solution

As part of customised energy service contracting solutions for the customers at the industrial park, GETEC has assumed the responsibility for all functional and cost risks associated with the supply of energy and utilities as well as system and facility management since 2011. This includes the provision and demand-based delivery of steam for production and heating purposes, electricity, compressed air, drinking water, extinguishing water, cooling water and natural gas for engine test beds.

Facts and Figures

Steam

Centrally:  2 hot water boilers (4,200 kW + 1,300 kW)
Locally: 1 hot water boiler (215 kW), 4 water heaters (230 kW), 20 dark radiators (680 kW), equivalent to a total of 1,125 kW

Compressed air and natural gas

Compressed air: 3 compressors with a total capacity of 2,800 m³/h
Natural gas supply: in 3 pressure stages with 5,700 kW of connected wattage

Electricity and water

Electricity: Medium voltage network with 9 transformer stations (connected wattage: 16,000 kW)
Water: The well operation is scheduled to be shut down shortly. We will then use the grid of the municipal works for the supply. Approx. 22,000 m³/a were delivered in the past three years.

Our services rendered for the Industrial park Friedrichsort

Industrial park operation

We take care of the entire logistics infrastructure - from energy and water supply to plant security and grid infrastructure.

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

Town of Turek (Poland)

The municipal works in Turek started operating in 1956 and are covering the entire range of communal services. The limited liability company is wholly owned by the municipality of Turek.


The customised GETEC energy solution

The challenge

Nearly 90,000 MWh of heat per year are needed for the properties in Turek with a population of 28,000 residents.

The goal

Above all, the new energy supply was supposed to be particularly economical, to realise low and stable energy costs for the community in the long term.

Our solution

GETEC presented a tailor-made concept and guarantees the town of Turek an economical, affordable and secure heat supply for a total of 30 years. The plan is to build a new plant on the property that was specifically purchased for this purpose. Starting in 2018, the heating station replaced the Adamów power station as heat supplier to the town of Turek.

Facts and Figures

Plant

2x pulverised lignite/gas fired hot water boilers (bivalent burner design)
1x gas fired hot water boiler

Supply

Hot water

Our services rendered for Turek

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy generation systems

Energy supply - efficient and decentralized.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Energie für Schleswig-Holstein 

The company Energie für Schleswig-Holstein GmbH was founded in 2016 as a joint venture between Wankendorfer Baugenossenschaft für Schleswig-Holstein eG and GETEC WÄRME & EFFIZIENZ GmbH and is based in Magdeburg. Since then, ESH has already provided comprehensive energy-related services and upgrades where necessary for 450 heat generation plants. More than 8,000 apartments are supplied with heat in a sustainable and cutting-edge fashion.


The customised GETEC energy solution

Efficient design of heat generators, heat grids with the utilisation of various energy sources.

The challenge

These days, many things need to be considered when supplying a property with heat. They range from the space required for the generation or interconnecting systems, to the operating safety and fitness for the future to sustainability and obviously the supply costs. 

The goal

A key aspect is the upgrade and maintenance of heat generation plants with the goal of the energy-efficient generation and distribution of thermal energy against the backdrop of climate protection and security of supply. In so doing, ESH examines the technical feasibility of an efficient design of heat generators, heat grids and utilisation of energy sources, depending on the regional circumstances.

Our solution

The use of combined heat and power generation by means of decentralised CHP units plays an important role in this context. The application of this technology is rewarded with a favourable primary energy factor. This means: The construction costs for buildings heated by means of this method decrease because fewer structural measures are required to erect an appropriately energy-efficient building. For instance, fewer insulating materials are needed or other improvement measures can be omitted, such as the use of solar power.

Facts and Figures

Supply

Heat

Number of supplied residential units

8,000

Number of plants

450

Berlin Exhibition Grounds 

Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.


The customised GETEC energy solution

The challenge

The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.

The goal

Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.

Our solution

Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.

Facts and Figures

CO2 savings

approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler

Plant

Boiler system, pellet boiler unit, CHP unit, cooling system 

Supply

Heat, cold, electricity

Our services rendered for Messe Berlin

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

Discover industries

GETEC supplies the right energy solution for every industry. Learn more about our solutions for other industries.

Learn more


We embody partnership –
find your counter­part.

With close to 30 locations throughout Germany and Europe, we are always at your doorstep.
Contact us. We are here for you.

You are looking for a counterpart near you?
Simply enter your zip code
Karte wird geladen...