We have the energy for a closer partnership.

We not only understand our business, we understand yours as well

This special expertise for process-related questions makes us an ideal partner for the industry and the real estate sector. As outsourcing partner, we relieve you from all energy-related questions, allowing you to focus on your core competences. With GETEC by your side, you can pool your resources where they are needed. Entrust us with your energy-related questions, leaving you with energy for more – for more performance and more success.

We embody partnership.
The customer is the focal point of our reasoning and actions.

Energie Partnerschaft

The energy world of tomorrow is digital, networked and green. GETEC acts as a guide helping customers navigate an increasingly complex energy world. Because aside from the technological process expertise, GETEC also possesses the regulatory know-how. We use our knowledge of laws and formalities to derive optimal energy concepts for our customers and to generate savings that are far higher than the efficiency goals of our customers. What’s more, with cooperation partnerships aimed at boosting the energy efficiency in the industry and the real estate sector, we are creating genuine added values.

Our references


a-ja Resort Grömitz

a-ja, a subsidiary of DSR Hotel Holding, is a new, up-and-coming, rapidly expanding holiday hotel brand. Its aspiration: Best holidays at the best price – hotel and spa for everyone. The a-ja concept represents a democratisation of luxury in the holiday hotel industry, featuring the components adventure gastronomy, generous spa offerings and the ambience of a suite.


The customised GETEC energy solution

The challenge

Set-up of a new CHP unit on the main floor of the a-ja resort Grömitz and hydraulic connection with the district heating network by way of a hybrid station. The strict requirements regarding the permissible noise emission of the Baltic Sea spa town of Grömitz as well as the hotel proper represented a particular challenge, which was considered early on in the planning of the unit.

The goal

In the context of the further expansion of the a-ja brand, a new a-ja resort was completed in Grömitz in 2015, which was connected to the district heating network. An invitation to tender for the construction of an appropriate CHP unit was additionally launched, among other things, for the purpose of generating electricity in-house. 

Our solution

GETEC built a CHP unit with a capacity of 140 kWel using natural gas as fuel base in the building of the a-ja resort of Grömitz.
All of the thermal energy is fed into the upstream district heating network.

Facts and Figures

Plant

CHP unit (cogeneration), hybridisation of district heating systems

Supply

Heat, electricity

Our services rendered for the a-ja Resort Grömitz

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy partnership

We not only understand our business, we understand yours as well. Your success is our motivation.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Industrial park Friedrichsort, Kiel

Kiel-Friedrichsort is not only close to nature but also an industrial centre. The former Maschinenbau Kiel (MaK) site has developed into a modern heavy-machinery location. International companies from the engine construction, rail engineering and foundry industries and other service providers and suppliers take advantage of the ideal infrastructure conditions at the site in Friedrichsort, such as access to the Kieler Förde and on-site sidings. With around 1,200 employees and an area of about 65 hectares, the industrial park is a major industrial centre and an important employer in the Kiel region.


The customised GETEC energy solution

The challenge

The complete supply structure of the industrial park was to be assigned to a single provider. Extensive retrofitting and upgrades were needed in this context.

The goal

The new operator was not only supposed to retrofit and upgrade, but also to finance the transferred supply systems.

Our solution

As part of customised energy service contracting solutions for the customers at the industrial park, GETEC has assumed the responsibility for all functional and cost risks associated with the supply of energy and utilities as well as system and facility management since 2011. This includes the provision and demand-based delivery of steam for production and heating purposes, electricity, compressed air, drinking water, extinguishing water, cooling water and natural gas for engine test beds.

Facts and Figures

Steam

Centrally:  2 hot water boilers (4,200 kW + 1,300 kW)
Locally: 1 hot water boiler (215 kW), 4 water heaters (230 kW), 20 dark radiators (680 kW), equivalent to a total of 1,125 kW

Compressed air and natural gas

Compressed air: 3 compressors with a total capacity of 2,800 m³/h
Natural gas supply: in 3 pressure stages with 5,700 kW of connected wattage

Electricity and water

Electricity: Medium voltage network with 9 transformer stations (connected wattage: 16,000 kW)
Water: The well operation is scheduled to be shut down shortly. We will then use the grid of the municipal works for the supply. Approx. 22,000 m³/a were delivered in the past three years.

Our services rendered for the Industrial park Friedrichsort

Industrial park operation

We take care of the entire logistics infrastructure - from energy and water supply to plant security and grid infrastructure.

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

G+D Gesellschaft für Energiemanagement mbH

The real estate group Deutsche Wohnen SE based in Berlin and the energy services provider GETEC have been in a strategic cooperation, the joint venture G+D Gesellschaft für Energiemanagement mbH, since 2013. The subject matter of the partnership is the energetic management of the properties of Deutsche Wohnen SE, which are scattered throughout Germany.


The customised GETEC energy solution

The challenge

GETEC and Deutsche Wohnen will plan and realise an appropriate, customised supply concept for every residential neighbourhood and/or supply structure. Apart from the technical requirements, the focus is also on efficiency measures to keep the rising energy costs in check. This will likewise benefit tenants of DW in the future. A total of approx. 111,000 residential units are currently supplied with heat.

Facts and Figures

CO2 savings

9,500 t per year

Supply

Heat and electricity

Number of supplied residential units

111,000 households

We consider this business model to be an attractive solution for the ecological and economical challenges as well as for the design of a sustainable energy concept for our real estate portfolio. This strategic partnership provides us with a high degree of co-determination on the one hand and with the flexibility to focus our resources on our core business on the other hand.

Michael Zahn

Chairperson of the executive board of Deutsche Wohnen SE

Berlin Exhibition Grounds 

Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.


The customised GETEC energy solution

The challenge

The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.

The goal

Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.

Our solution

Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.

Facts and Figures

CO2 savings

approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler

Plant

Boiler system, pellet boiler unit, CHP unit, cooling system 

Supply

Heat, cold, electricity

Our services rendered for Messe Berlin

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

Discover industries

GETEC supplies the right energy solution for every industry. Learn more about our solutions for other industries.

Learn more


We embody partnership –
find your counter­part.

With close to 30 locations throughout Germany and Europe, we are always at your doorstep.
Contact us. We are here for you.

You are looking for a counterpart near you?
Simply enter your zip code
Karte wird geladen...