We have the energy for a closer partnership.

We not only understand our business, we understand yours as well

This special expertise for process-related questions makes us an ideal partner for the industry and the real estate sector. As outsourcing partner, we relieve you from all energy-related questions, allowing you to focus on your core competences. With GETEC by your side, you can pool your resources where they are needed. Entrust us with your energy-related questions, leaving you with energy for more – for more performance and more success.

We embody partnership.
The customer is the focal point of our reasoning and actions.

Energie Partnerschaft

The energy world of tomorrow is digital, networked and green. GETEC acts as a guide helping customers navigate an increasingly complex energy world. Because aside from the technological process expertise, GETEC also possesses the regulatory know-how. We use our knowledge of laws and formalities to derive optimal energy concepts for our customers and to generate savings that are far higher than the efficiency goals of our customers. What’s more, with cooperation partnerships aimed at boosting the energy efficiency in the industry and the real estate sector, we are creating genuine added values.

Our references


a-ja Resort Grömitz

a-ja, a subsidiary of DSR Hotel Holding, is a new, up-and-coming, rapidly expanding holiday hotel brand. Its aspiration: Best holidays at the best price – hotel and spa for everyone. The a-ja concept represents a democratisation of luxury in the holiday hotel industry, featuring the components adventure gastronomy, generous spa offerings and the ambience of a suite.


The customised GETEC energy solution

The challenge

Set-up of a new CHP unit on the main floor of the a-ja resort Grömitz and hydraulic connection with the district heating network by way of a hybrid station. The strict requirements regarding the permissible noise emission of the Baltic Sea spa town of Grömitz as well as the hotel proper represented a particular challenge, which was considered early on in the planning of the unit.

The goal

In the context of the further expansion of the a-ja brand, a new a-ja resort was completed in Grömitz in 2015, which was connected to the district heating network. An invitation to tender for the construction of an appropriate CHP unit was additionally launched, among other things, for the purpose of generating electricity in-house. 

Our solution

GETEC built a CHP unit with a capacity of 140 kWel using natural gas as fuel base in the building of the a-ja resort of Grömitz.
All of the thermal energy is fed into the upstream district heating network.

Facts and Figures

Plant

CHP unit (cogeneration), hybridisation of district heating systems

Supply

Heat, electricity

Our services rendered for the a-ja Resort Grömitz

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy partnership

We not only understand our business, we understand yours as well. Your success is our motivation.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Industrial park Friedrichsort, Kiel

Kiel-Friedrichsort is not only close to nature but also an industrial centre. The former Maschinenbau Kiel (MaK) site has developed into a modern heavy-machinery location. International companies from the engine construction, rail engineering and foundry industries and other service providers and suppliers take advantage of the ideal infrastructure conditions at the site in Friedrichsort, such as access to the Kieler Förde and on-site sidings. With around 1,200 employees and an area of about 65 hectares, the industrial park is a major industrial centre and an important employer in the Kiel region.


The customised GETEC energy solution

The challenge

The complete supply structure of the industrial park was to be assigned to a single provider. Extensive retrofitting and upgrades were needed in this context.

The goal

The new operator was not only supposed to retrofit and upgrade, but also to finance the transferred supply systems.

Our solution

As part of customised energy service contracting solutions for the customers at the industrial park, GETEC has assumed the responsibility for all functional and cost risks associated with the supply of energy and utilities as well as system and facility management since 2011. This includes the provision and demand-based delivery of steam for production and heating purposes, electricity, compressed air, drinking water, extinguishing water, cooling water and natural gas for engine test beds.

Facts and Figures

Steam

Centrally:  2 hot water boilers (4,200 kW + 1,300 kW)
Locally: 1 hot water boiler (215 kW), 4 water heaters (230 kW), 20 dark radiators (680 kW), equivalent to a total of 1,125 kW

Compressed air and natural gas

Compressed air: 3 compressors with a total capacity of 2,800 m³/h
Natural gas supply: in 3 pressure stages with 5,700 kW of connected wattage

Electricity and water

Electricity: Medium voltage network with 9 transformer stations (connected wattage: 16,000 kW)
Water: The well operation is scheduled to be shut down shortly. We will then use the grid of the municipal works for the supply. Approx. 22,000 m³/a were delivered in the past three years.

Our services rendered for the Industrial park Friedrichsort

Industrial park operation

We take care of the entire logistics infrastructure - from energy and water supply to plant security and grid infrastructure.

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

SCHOELLERSHAMMER GmbH & Co. KG 

The SCHOELLERSHAMMER paper-mill is producing corrugated base sheets using two paper making machines in the long-standing business location Düren. With a corporate history of 230 years, it is among the oldest paper-mills in Germany. Nearly 800 tons of paper is leaving the factory premises daily. With its 24/7 continuous operation, SCHOELLERSHAMMER is making an important contribution to life-cycle management, thereby conserving resources.

To the customer's website


The customised GETEC energy solution

High-efficiency CHP plant secures paper production.

The challenge

With a new paper making machine, the paper-mill has marked a milestone in its more than 230-year history of the family business, and substantially boosted its production capacity. Due to the planned increase in the paper production from 230,000 tons to more than 500,000 tons a year, the energy need has risen as well. 

The goal

Development of a high-efficiency combined heat and power plant that fulfils the requirements for a sustainable energy supply at the Düren location, while at the same time contributing to the success of the transition toward renewable energies. 

Our solution

The plant generates approx. 180 GWh/a of heat with a maximum steam capacity of 71 tons per hour. The electricity generated with combined heat and power covers the combined heating and power station’s own needs as well as partly the needs of the paper-mill. Thus, the energy supply to the long-standing location in Düren has now been secured well into the future. 

Facts and Figures

Plant

With pulverised lignite + natural gas + use of sewage gas from the sewage treatment plant of the paper-mill is an example of a multi-fuel fired plant

Supply

Heat, steam

Our services rendered for SCHOELLERSHAMMER

Energy-intensive industry

Significant reduction in emissions - benefit from cost advantages through innovative energies.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Steam supply

Safe and reliable steam supply

Learn more

G+D Gesellschaft für Energiemanagement mbH

The real estate group Deutsche Wohnen SE based in Berlin and the energy services provider GETEC have been in a strategic cooperation, the joint venture G+D Gesellschaft für Energiemanagement mbH, since 2013. The subject matter of the partnership is the energetic management of the properties of Deutsche Wohnen SE, which are scattered throughout Germany.


The customised GETEC energy solution

The challenge

GETEC and Deutsche Wohnen will plan and realise an appropriate, customised supply concept for every residential neighbourhood and/or supply structure. Apart from the technical requirements, the focus is also on efficiency measures to keep the rising energy costs in check. This will likewise benefit tenants of DW in the future. A total of approx. 111,000 residential units are currently supplied with heat.

Facts and Figures

CO2 savings

9,500 t per year

Supply

Heat and electricity

Number of supplied residential units

111,000 households

We consider this business model to be an attractive solution for the ecological and economical challenges as well as for the design of a sustainable energy concept for our real estate portfolio. This strategic partnership provides us with a high degree of co-determination on the one hand and with the flexibility to focus our resources on our core business on the other hand.

Michael Zahn

Chairperson of the executive board of Deutsche Wohnen SE


Discover industries

GETEC supplies the right energy solution for every industry. Learn more about our solutions for other industries.

Learn more


We embody partnership –
find your counter­part.

With close to 30 locations throughout Germany and Europe, we are always at your doorstep.
Contact us. We are here for you.

You are looking for a counterpart near you?
Simply enter your zip code
Karte wird geladen...