Our references


UELZENA eG (Uelzen)

The Uelzena Group is a leading food and milk processing provider. Aside from the manufacture of butter and butterfat at the Uelzen production site, the customers’ own products are spray dried by means of high-pressure steam.

To the customer's website


The customised GETEC energy solution

Modern and efficient energy supply concept for the dairy industry.

The challenge

Upgrade of the existing boiler house that supplies steam for the dairy, under continuous operation and without interruption. 

The goal

The coverage of the high requirements for heat and power at the Uelzen location was to be realised in an economically viable fashion as compared to the separate generation of heat in the existing boiler system as well as compared to the external acquisition of power. At the same time, it was essential to minimise the risks associated with the transition toward renewable energies, such as grid fluctuations and total loss of power.

Our solution

GETEC set up a cogeneration power plant with two CHP units and a waste heat recovery boiler. The system is completed with the new construction of two natural gas boilers (shell boiler), which replace two outdated existing boilers. In addition, GETEC is supporting Uelzena’s power supply by implementing a smart load management system. 

Facts and Figures

CO2 savings

5,050 t/a

CHP

4,420 kWth, electrical output: 4,290 kW, energy source: natural gas

Supply

High-pressure steam, heat, power

Steam­ generation­ plant

3 x 11 MWth, steam pressure: 18 barabove atmospheric, energy source: natural gas

The GETEC energy specialists delved into the production processes of Uelzena and created power engineering that matches the company and is in unison with the production.

Dr Peter Fichtl

Managing director of production and engineering, UELZENA

Our services rendered for UELZENA

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

CHP units

Heat and electricity from our own CHP unit - decentralised and efficient

Learn more

Radici Chimica Deutschland GmbH

Radici Chimica Deutschland GmbH, a chemical company belonging to the Italian Radici Group, produces over 100,000 tonnes of adipic acid per year in the Zeitz Chemical Park. The white powder is the raw material for the production of nylon and other plastics, which, for example, are used in the automotive and clothing industries.

To the customer's website


The customised GETEC energy solution

Modern and efficient energy supply concept for the chemical industry.

The challenge

Because the previous steam supply from the power station Mumsdorf was shut down in the summer of 2013, the management of the chemical company was looking for a viable, ultra-efficient and economical energy supply.

The goal

In the context of the supply concept, the idea was to also destroy the climate-damaging nitrous oxide (N2O) that accumulates on site, thereby lowering the greenhouse gas emission.

Our solution

GETEC opted to install two separate shell boilers. One is fired with particularly economical brown coal dust, whilst the other is fired with natural gas.

Facts and Figures

CO2 savings

approximately 100,000 tons of CO2 equivalents per year

Plant

Combined heat and power station with 2 steam boilers and back pressure steam turbine

Supply

Steam, electricity

Installed capacity

Thermal output: 37.1 MW;
Electrical output: 681 kW

We would never have dared to imagine that the problem with nitrous oxide can be resolved with pulverised lignite firing. […] This helps Radici achieve major savings in emissions trading, close to a million euros each year.


Jens Metzner

Plant manager of Radici Chimica Deutschland GmbH in the chemical and industrial park of Zeitz

Our services rendered for Radici Chimica

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Utilisation of specialty gases

Thermal utilisation of climate-changing special gases - pure environmental protection

Learn more

Steam supply

Safe and reliable steam supply

Learn more

Berlin Exhibition Grounds 

Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.


The customised GETEC energy solution

The challenge

The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.

The goal

Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.

Our solution

Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.

Facts and Figures

CO2 savings

approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler

Plant

Boiler system, pellet boiler unit, CHP unit, cooling system 

Supply

Heat, cold, electricity

Our services rendered for Messe Berlin

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

UNESCO world heritage site housing estate "Weiße Stadt" in Berlin-Reinickendorf

The successful transition toward renewable energies is a collaborative effort. GETEC in cooperation with real estate companies has been developing successful energy efficiency initiatives since 2013. The foundation was laid with Deutsche Wohnen SE and the milestone project “Weiße Stadt [White City]” of the joint energy services company G+D Energiemanagement mbH. 


The customised GETEC energy solution

The goal is to generate additional profits with a sustainable and consistent realisation of all possible savings potentials.

The challenge

Supply of approx. 2,500 households with heat / combined heat and power station and district heating network with 31 substations

The goal

Reduction of the primary energy factor of the Weiße Stadt district heating territory from 1.3 to 0.89

Our solution

•  Set-up of 2 x 5.8 MW hot water boilers
•  Maximum energy efficiency by using economisers in the waste gas stream of the hot water boilers
•  Set-up of an ultra-modern CHP unit (1 MWel)
•  Feed-in into the public 10 kV grid

Facts and Figures

CO2 savings

Reduction of the emission by 3,800 t/a

Plant

Ultra-modern CHP unit (1 MWel) with a total thermal capacity of 12,550 KW

Supply

Heat

Our services rendered for Weiße Stadt

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Strategic partnerships

Energy efficiency cooperations between strong partners

Learn more

Ancillary cost optimisation

Full service for industry and real estate

Learn more

We embody partnership –
find your contact.

With more than 70 locations throughout Europe, we are always at your doorstep.
Contact us. We are here for you.

Contact
Sie suchen einen Ansprechpartner in Ihrer Nähe?
Einfach Postleitzahl eingeben
Karte wird geladen...