We have the energy for a closer partnership.

We not only understand our business, we understand yours as well

This special expertise for process-related questions makes us an ideal partner for the industry and the real estate sector. As outsourcing partner, we relieve you from all energy-related questions, allowing you to focus on your core competences. With GETEC by your side, you can pool your resources where they are needed. Entrust us with your energy-related questions, leaving you with energy for more – for more performance and more success.

We embody partnership.
The customer is the focal point of our reasoning and actions.

Energie Partnerschaft

The energy world of tomorrow is digital, networked and green. GETEC acts as a guide helping customers navigate an increasingly complex energy world. Because aside from the technological process expertise, GETEC also possesses the regulatory know-how. We use our knowledge of laws and formalities to derive optimal energy concepts for our customers and to generate savings that are far higher than the efficiency goals of our customers. What’s more, with cooperation partnerships aimed at boosting the energy efficiency in the industry and the real estate sector, we are creating genuine added values.

Our references


Berlin Exhibition Grounds 

Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.


The customised GETEC energy solution

The challenge

The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.

The goal

Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.

Our solution

Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.

Facts and Figures

CO2 savings

approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler

Plant

Boiler system, pellet boiler unit, CHP unit, cooling system 

Supply

Heat, cold, electricity

Our services rendered for Messe Berlin

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

a-ja Resort Grömitz

a-ja, a subsidiary of DSR Hotel Holding, is a new, up-and-coming, rapidly expanding holiday hotel brand. Its aspiration: Best holidays at the best price – hotel and spa for everyone. The a-ja concept represents a democratisation of luxury in the holiday hotel industry, featuring the components adventure gastronomy, generous spa offerings and the ambience of a suite.


The customised GETEC energy solution

The challenge

Set-up of a new CHP unit on the main floor of the a-ja resort Grömitz and hydraulic connection with the district heating network by way of a hybrid station. The strict requirements regarding the permissible noise emission of the Baltic Sea spa town of Grömitz as well as the hotel proper represented a particular challenge, which was considered early on in the planning of the unit.

The goal

In the context of the further expansion of the a-ja brand, a new a-ja resort was completed in Grömitz in 2015, which was connected to the district heating network. An invitation to tender for the construction of an appropriate CHP unit was additionally launched, among other things, for the purpose of generating electricity in-house. 

Our solution

GETEC built a CHP unit with a capacity of 140 kWel using natural gas as fuel base in the building of the a-ja resort of Grömitz.
All of the thermal energy is fed into the upstream district heating network.

Facts and Figures

Plant

CHP unit (cogeneration), hybridisation of district heating systems

Supply

Heat, electricity

Our services rendered for the a-ja Resort Grömitz

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy partnership

We not only understand our business, we understand yours as well. Your success is our motivation.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

SCHOELLERSHAMMER GmbH & Co. KG 

The SCHOELLERSHAMMER paper-mill is producing corrugated base sheets using two paper making machines in the long-standing business location Düren. With a corporate history of 230 years, it is among the oldest paper-mills in Germany. Nearly 800 tons of paper is leaving the factory premises daily. With its 24/7 continuous operation, SCHOELLERSHAMMER is making an important contribution to life-cycle management, thereby conserving resources.

To the customer's website


The customised GETEC energy solution

High-efficiency CHP plant secures paper production.

The challenge

With a new paper making machine, the paper-mill has marked a milestone in its more than 230-year history of the family business, and substantially boosted its production capacity. Due to the planned increase in the paper production from 230,000 tons to more than 500,000 tons a year, the energy need has risen as well. 

The goal

Development of a high-efficiency combined heat and power plant that fulfils the requirements for a sustainable energy supply at the Düren location, while at the same time contributing to the success of the transition toward renewable energies. 

Our solution

The plant generates approx. 180 GWh/a of heat with a maximum steam capacity of 71 tons per hour. The electricity generated with combined heat and power covers the combined heating and power station’s own needs as well as partly the needs of the paper-mill. Thus, the energy supply to the long-standing location in Düren has now been secured well into the future. 

Facts and Figures

Plant

With pulverised lignite + natural gas + use of sewage gas from the sewage treatment plant of the paper-mill is an example of a multi-fuel fired plant

Supply

Heat, steam

Our services rendered for SCHOELLERSHAMMER

Energy-intensive industry

Significant reduction in emissions - benefit from cost advantages through innovative energies.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Steam supply

Safe and reliable steam supply

Learn more

Energie für Schleswig-Holstein 

The company Energie für Schleswig-Holstein GmbH was founded in 2016 as a joint venture between Wankendorfer Baugenossenschaft für Schleswig-Holstein eG and GETEC WÄRME & EFFIZIENZ GmbH and is based in Magdeburg. Since then, ESH has already provided comprehensive energy-related services and upgrades where necessary for 450 heat generation plants. More than 8,000 apartments are supplied with heat in a sustainable and cutting-edge fashion.


The customised GETEC energy solution

Efficient design of heat generators, heat grids with the utilisation of various energy sources.

The challenge

These days, many things need to be considered when supplying a property with heat. They range from the space required for the generation or interconnecting systems, to the operating safety and fitness for the future to sustainability and obviously the supply costs. 

The goal

A key aspect is the upgrade and maintenance of heat generation plants with the goal of the energy-efficient generation and distribution of thermal energy against the backdrop of climate protection and security of supply. In so doing, ESH examines the technical feasibility of an efficient design of heat generators, heat grids and utilisation of energy sources, depending on the regional circumstances.

Our solution

The use of combined heat and power generation by means of decentralised CHP units plays an important role in this context. The application of this technology is rewarded with a favourable primary energy factor. This means: The construction costs for buildings heated by means of this method decrease because fewer structural measures are required to erect an appropriately energy-efficient building. For instance, fewer insulating materials are needed or other improvement measures can be omitted, such as the use of solar power.

Facts and Figures

Supply

Heat

Number of supplied residential units

8,000

Number of plants

450


Discover industries

GETEC supplies the right energy solution for every industry. Learn more about our solutions for other industries.

Learn more


We embody partnership –
find your counter­part.

With close to 30 locations throughout Germany and Europe, we are always at your doorstep.
Contact us. We are here for you.

You are looking for a counterpart near you?
Simply enter your zip code
Karte wird geladen...