Our references


Berlin Exhibition Grounds 

Messe Berlin with its fair grounds comprising nearly 550,000 m2 of floor space, 170,000 m2 of hall space (26 halls) and the International Congress Centre (ICC) Berlin is a crucial economic factor for the German capital and is among the ten top-selling trade fair corporations in the world.


The customised GETEC energy solution

The challenge

The energy costs associated with annual heat requirements of approx. 60 million kWh and power requirements of approx. 37 million kWh as well as the associated CO2 emissions represent a significant locational factor. GETEC was asked to develop a cost-efficient and sustainable solution.

The goal

Therefore, Messe Berlin’s goal was to lower the energy costs and the CO2 emissions.

Our solution

Energy savings performance contracting and innovative plant engineering enabled GETEC to lower the energy consumption of Messe Berlin by approximately 30%. This saves approx. 10,000 tonnes of CO2 emissions per year.

Facts and Figures

CO2 savings

approx. 3,000 to 4,000 tons per year by means of a wood pellet boiler

Plant

Boiler system, pellet boiler unit, CHP unit, cooling system 

Supply

Heat, cold, electricity

Our services rendered for Messe Berlin

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

EMMTEC services BV at the location emmtec Industry & Businesspark

Covering an area of 115 hectares, the emmtec Industry & Businesspark in Emmen is the largest industrial park in Northern Netherlands. A total of ten production plants from the biochemistry, fibre and polymer industries employ approximately 2,100 people at the site. 27 hectares of expandable surface area also offer a perfect supply of new settlements. Empowering your business. With EMMTEC Services – an enterprise of the GETEC Group.

To the customer's website


The customised GETEC energy solution

Tailor-made service and supply concepts: Required media, logistics, laboratory and engineering services

The challenge

As site operator for all local businesses, we operate a collective service concept in a complex network of material and energy flows.

The goal

As infrastructure operator, we strive to offer all services for industrial parks.

Our solution

With its customised services portfolio, EMMTEC services offers local companies ideal conditions. GETEC's redundant production supply units (assets) and infrastructure ensures that the production plants are supplied with the required utilities at all times.

Facts and Figures

Area

115 hectares, fully developed,
140,000 m² of building space,
90,000 m² of storage space,
2,000 m² of laboratory space,
8,400 m² of office space

Plant inventory

2 x 32 MWel combined cycle gas turbine power plant,
2 x 100 t/h of steam (up to 30 bar),
8 MW of refrigeration from absorption refrigeration and compression-type refrigeration machines,
180 m³/h of demineralised water, 
120 m³/h of drinking water,
400 m³/h of process water,
81,000 m³/h of compressed air,
Sewage treatment plant for 120,000 PE,
Air separation installation for nitrogen (1,350 Nm³/h),
10 x 300 m³ silo parks

Grids

150 km medium voltage network,
11 transfer stations,
154 oil-free transformers,
autonomous electricity system,
4.5 km natural gas network (up to 20 bar)

CO2 savings

The integral consideration as well as operation of the media supply achieves optimal energy efficiency. This enabled our customers to realise savings of 43% of CO2 per ton between 1990 and 2018.

Our services rendered for emmtec Industry & Businesspark

Industrial park operation

We take care of the entire logistics infrastructure - from energy and water supply to plant security and grid infrastructure.

Learn more

Decentralised energy supply

The future is decentralised. For more efficiency, more independence and more flexibility.

Learn more

Supply solutions

Simple and reliable supply - with GETEC

Learn more

Town of Turek (Poland)

The municipal works in Turek started operating in 1956 and are covering the entire range of communal services. The limited liability company is wholly owned by the municipality of Turek.


The customised GETEC energy solution

The challenge

Nearly 90,000 MWh of heat per year are needed for the properties in Turek with a population of 28,000 residents.

The goal

Above all, the new energy supply was supposed to be particularly economical, to realise low and stable energy costs for the community in the long term.

Our solution

GETEC presented a tailor-made concept and guarantees the town of Turek an economical, affordable and secure heat supply for a total of 30 years. The plan is to build a new plant on the property that was specifically purchased for this purpose. Starting in 2018, the heating station replaced the Adamów power station as heat supplier to the town of Turek.

Facts and Figures

Plant

2x pulverised lignite/gas fired hot water boilers (bivalent burner design)
1x gas fired hot water boiler

Supply

Hot water

Our services rendered for Turek

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy generation systems

Energy supply - efficient and decentralized.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

a-ja Resort Grömitz

a-ja, a subsidiary of DSR Hotel Holding, is a new, up-and-coming, rapidly expanding holiday hotel brand. Its aspiration: Best holidays at the best price – hotel and spa for everyone. The a-ja concept represents a democratisation of luxury in the holiday hotel industry, featuring the components adventure gastronomy, generous spa offerings and the ambience of a suite.


The customised GETEC energy solution

The challenge

Set-up of a new CHP unit on the main floor of the a-ja resort Grömitz and hydraulic connection with the district heating network by way of a hybrid station. The strict requirements regarding the permissible noise emission of the Baltic Sea spa town of Grömitz as well as the hotel proper represented a particular challenge, which was considered early on in the planning of the unit.

The goal

In the context of the further expansion of the a-ja brand, a new a-ja resort was completed in Grömitz in 2015, which was connected to the district heating network. An invitation to tender for the construction of an appropriate CHP unit was additionally launched, among other things, for the purpose of generating electricity in-house. 

Our solution

GETEC built a CHP unit with a capacity of 140 kWel using natural gas as fuel base in the building of the a-ja resort of Grömitz.
All of the thermal energy is fed into the upstream district heating network.

Facts and Figures

Plant

CHP unit (cogeneration), hybridisation of district heating systems

Supply

Heat, electricity

Our services rendered for the a-ja Resort Grömitz

Energy service contracting

Customised complete solutions - planning, construction, financing, operation

Learn more

Energy partnership

We not only understand our business, we understand yours as well. Your success is our motivation.

Learn more

Fuel management

Sustainable and balanced fuel mix

Learn more

We embody partnership –
find your contact.

With more than 70 locations throughout Europe, we are always at your doorstep.
Contact us. We are here for you.

Contact
Sie suchen einen Ansprechpartner in Ihrer Nähe?
Einfach Postleitzahl eingeben
Karte wird geladen...